Continuous Caustic | Chemical

Mechanical Engineering  •  Electrical Engineering  •  Controls & Automation
August 2015 – February 2017

Collier Associates provided engineering services to provide a complete mechanical, electrical, and structural design package. The project consisted of expanding the existing batch caustic system to include a new continuous caustic system. The detailed design construction package includes structural design, mechanical piping design, instrumentation installation design, and electrical design. Throughout the project, Collier Associates coordinated and worked closely with plant process engineers and operators to integrate the new caustic system with the existing system and successfully tie the existing furnace and other utilities into the new system. Collier Associates also coordinated with the system manufacturer throughout the design and provided submittal review and document tracking. Collier Associates then provided detailed design to implement the new system into the existing control system. Onsite construction support was provided throughout the construction process & startup, and commissioning trouble-shooting support was provided onsite during startup.

Have Any Questions?

Innovative Engineering Solutions
for Industrial Leaders

Contact Info

Collier Associates, Inc.

5129 Gilbertsville Hwy
Calvert City, Ky 42029

270.395.7686

Our Companies

Collier Inc.
www.collierinc.com

Collier Electric
www.collierelectricinc.com

© 2020 Collier Associates, Inc. All Right Reserved.